Public
Faculty of Education — UA
University of Alicante, Spain
New Faculty of Education at the University of Alicante. Includes a basement floor, specialist classrooms, teaching workshops, seminar rooms and 6 computer labs.
Technical solution
Production
Centralized production using air-to-water heat pumps.
Distribution
Hydronic network feeding fan coil units, with independent zone control (classrooms and offices).
Efficiency
Fresh-air renewal without recirculation, guaranteeing indoor air quality and energy savings.
Site photography — 3
Public
Conference Center
Elche, Spain
Three floors and an underground parking garage. Main auditorium, conference room, multipurpose rooms, exhibition areas and tourism management offices.
Technical solution
Production
Centralized production using air-to-water heat pumps.
Distribution
Hydronic network feeding AHUs (large halls) and fan coil units, with independent zone control.
Efficiency
Fresh-air renewal and variable thermal load management according to event occupancy.
Site photography — 3
Public
Business Creation Center — UA
University of Alicante, Spain
Modular offices for technology-based companies, coworking areas, laboratories, meeting rooms and a multipurpose auditorium.
Technical solution
Production
Centralized production using air-to-water heat pumps.
Distribution
Hydronic network feeding fan coil units and AHUs, with independent zone control (offices and laboratories).
Efficiency
Automated fresh-air renewal and integrated management to reduce environmental impact.
Site photography — 3
Public
CEIP Dr. Álvaro Esquerdo School
Spain
Three-story block and a separate gymnasium. 9 pre-school classrooms, 18 primary classrooms, a dining hall for 400, a library and sports courts.
Technical solution
Production
Centralized production using air-to-water heat pumps.
Distribution
Hydronic network feeding fan coil units and AHUs, with independent zone control (classrooms and dining hall).
Efficiency
Fresh-air renewal with heat recovery units and intelligent management for thermal comfort and savings.
Site photography — 3
Public
La Mata Sports Hall
Torrevieja, Spain
Regulation multi-sport court, gym, changing rooms and stands. The first municipal sports facility in Torrevieja to be fully air-conditioned.
Technical solution
Production
Centralized plant based on air-to-water technology.
Distribution
Hydronic transport to AHUs and fan coil units, with independent management by area.
Efficiency
Primary air supply with heat recovery units, guaranteeing thermal comfort and savings during events.
Site photography — 3
Public
Valverde Building — UMH
Elche campus, Spain
Four floors of critical engineering infrastructure: research laboratories, teaching workshops, departmental offices and seminar spaces. The technological hub of the campus.
Technical solution
Production
Centralized plant based on air-to-water technology.
Distribution
Hydronic transport to AHUs and fan coil units, with independent management by area.
Efficiency
Primary air supply with heat recovery units, guaranteeing thermal comfort and savings during events.
Site photography — 3
Public
TGSS / INSS Social Security Office
Torrevieja, Spain
Integrated Social Security office. Public-facing offices, administrative areas and archives, with a glazed façade that prioritizes natural light.
Technical solution
Production
Thermal generation using reversible air-to-water heat pumps.
Distribution
Hydronic circuit feeding fan coil units and AHUs, with independent control in public service areas.
Efficiency
Air renewal with enthalpy recovery to optimize indoor air quality and energy consumption.
Site photography — 3
Public
Faculty of Dentistry — CEU
Spain
Four floors refurbished to high-efficiency standards. Dental clinics, preclinical laboratories, advanced simulation rooms and teaching classrooms.
Technical solution
Production
Centralized plant based on air-to-water technology.
Distribution
Hydronic transport to AHUs and fan coil units, with zoned thermal management by surgery.
Efficiency
Primary air supply with heat recovery units, guaranteeing aseptic conditions and thermal comfort.
Site photography — 3
Hospitality
Hotel Ibis
Elche, Spain
Functional, optimized design. Soundproofed rooms, dining areas, meeting rooms and shared service zones, built to Accor standards.
Technical solution
Production
Centralized production using air-to-water heat pumps.
Distribution
Hydronic network feeding quiet fan coil units and AHUs, with individual comfort setpoints.
Efficiency
Dehumidification and air renewal with heat recovery, optimizing performance in humid climates.
Site photography — 3
Hospitality
Hotel Eurostars Pórtico
Alicante, Spain
Refurbished historic building. Luxury rooms, fine-dining restaurant, gym and rooftop terrace, with invisible HVAC that respects the architectural aesthetic.
Technical solution
Production
Centralized production using air-to-water heat pumps.
Distribution
Hydronic network feeding low-profile fan coil units (limited false-ceiling space) and AHUs, with smart control room by room.
Efficiency
Silent air renewal with heat recovery, guaranteeing thermal comfort and savings.
Site photography — 3
Hospitality
Hotel Magic Cristal Park
Benidorm, Spain
Iconic breathable glazed roof. Large event halls, extensive games area and a heated pool under a dome — advanced humidity management across large volumes.
Technical solution
Production
Centralized production using air-to-water heat pumps.
Distribution
Hydronic network feeding AHUs and fan coil units, with zoned control in leisure areas and the heated pool.
Efficiency
Dehumidification with heat recovery, using the waste heat to preheat the pool water.
Site photography — 3
Hospitality
SHA Wellness Clinic
El Albir, Spain
World-renowned ultra-luxury health and wellness resort. An 8,000 m² wellness area and heated pools — HVAC design of the utmost precision.
Technical solution
Production
Simultaneous production using multi-pipe heat pumps.
Distribution
Hydronic network feeding concealed fan coil units and AHUs, with BMS control room by room.
Efficiency
Full heat recovery for DHW and pools, ensuring premium comfort and an A energy rating.
Site photography — 3
Hospitality
Hotel NH
Alicante, Spain
A benchmark for business tourism. Conference center with modular rooms and a wellness area with sauna, jacuzzi and gym.
Technical solution
Production
Centralized production using air-to-water heat pumps.
Distribution
Hydronic network feeding quiet fan coil units and AHUs, with zoned thermal control by floor.
Efficiency
Dehumidification in the spa area and air renewal with heat recovery, optimizing consumption in high-occupancy areas.
Site photography — 3
Hospitality
Zem Wellness Clinic
Altea, Spain
The ultra-luxury benchmark in the Mediterranean. Invisible equipment integration and premium acoustic comfort. The clinical area — pools, spas and treatment cabins — demands critical thermo-hygrometric management, resolved with independent systems.
Technical solution
Production
Centralized production using air-to-water heat pumps. Dehumidification with heat recovery for pool and ambient climate control.
Distribution
Hydronic network feeding concealed fan coil units and AHUs, with smart management room by room. Primary air with high-efficiency filtration and low-velocity linear diffusion.
Efficiency
Air renewal with enthalpy recovery and occupancy sensing. Load management via electronic pumping.
Site photography — 6
Hospitality
Hotel Flamingo Oasis
Benidorm, Spain
Large-volume complex with an entertainment hall, dining areas and a heated winter pool. Requires managing wide thermal load swings.
Technical solution
Production
Centralized production using air-to-water heat pumps.
Distribution
Hydronic network feeding high-flow AHUs and fan coil units, with technical zoning across common areas.
Efficiency
Air renewal with heat recovery and humidity control, optimizing operational performance.
Site photography — 3
Hospitality
Medplaya Riudor
Benidorm, Spain
A strategic part of Benidorm. Event halls, dining areas and an outdoor pool, with HVAC designed for uninterrupted service.
Technical solution
Production
Centralized production using air-to-water heat pumps.
Distribution
Hydronic network feeding fan coil units and AHUs, with independent management for common areas and guest rooms.
Efficiency
Fresh-air renewal with enthalpy recovery, guaranteeing indoor air quality and optimized consumption.
Site photography — 3
Hospitality
Hotel Alicante Golf
Alicante, Spain
Infrastructure integrated into the golf course setting. Convention center, spa and gym — precise technical management to balance comfort and efficiency.
Technical solution
Production
Centralized production using chillers and air-to-water heat pumps (for the spa).
Distribution
Hydronic network feeding AHUs and fan coil units, with zoned control by hall and room.
Efficiency
Air renewal with heat recovery and humidity management, guaranteeing savings and indoor air quality.
Site photography — 3
Hospitality
Levante Lux
Benidorm, Spain
Superior-category tourist apartments with living room and kitchen, common areas and a pool. Requires per-user thermal autonomy and efficient renewal in units with kitchens.
Technical solution
Production
Centralized production using air-to-water heat pumps (aerothermal).
Distribution
Hydronic network feeding fan coil units, with independent thermostats in living rooms and bedrooms.
Efficiency
Air renewal with heat recovery and dedicated extraction, optimizing comfort and indoor air quality.
Site photography — 3
Industrial
Clean Room — Plásticos Inden
Spain
Controlled production environment. The installation centers on air quality and positive pressure to meet ISO standards, where particles can compromise the final product.
Technical solution
Production
Specialized climate control using a 15,000 m³/h AHU with thermo-hygrometric control.
Distribution
Sealed, insulated sheet-metal ducting, guaranteeing airtightness, cleanliness and efficiency.
Efficiency
Free cooling, absolute filtration (F-7), high-efficiency fans and BMS control.
Site photography — 2
Industrial
Iberpapel 2
Benimarfull, Spain
Industrial plant producing cigarette paper (2016). Strict relative humidity control (50–60%) is crucial to the paper’s dimensional stability and combustion properties.
Technical solution
Production
Centralized production using chillers (614 kW) and oil-fired boilers (345 kW).
Distribution
Hydronic network feeding AHUs (45,000 m³/h total) with a misting humidification system.
Efficiency
Centralized management system (BMS) for monitoring and optimizing consumption.
Site photography — 2
Industrial
Mondraker Headquarters
Elche, Spain
Cutting-edge architecture in the form of a glass-and-steel cylinder. Offices, R&D, design, assembly and showrooms. Efficiency through passive solutions such as an external mesh controlling solar radiation.
Technical solution
Production
Centralized installation using air-to-water heat pumps and VRF systems for cooling and heating.
Distribution
Hydronic network feeding AHUs and a refrigerant gas network feeding fan coil units, with individual zone control.
Efficiency
Heat recovery units on the ventilation and centralized BMS control to optimize consumption.
Site photography — 2
Industrial
Iberstraw
Benimarfull, Spain
Industrial plant producing biodegradable paper straws. Strict relative humidity control is essential to the paper’s dimensional stability.
Technical solution
Production
Centralized production using chillers (614 kW) and air-to-water heat pumps.
Distribution
Hydronic network feeding AHUs (45,000 m³/h total) with a misting humidification system.
Efficiency
Centralized management system (BMS) for monitoring and optimizing consumption.
Site photography — 2
Industrial
PLD Space Headquarters
Elche, Spain
Payload Aerospace. Full HVAC installation across critical areas: ISO 8 clean room, avionics laboratories, control bunker and offices.
Technical solution
Production
Centralized installation using variable refrigerant flow (VRF) air-to-air heat pumps.
Distribution
Refrigerant gas network feeding cassette-type fan coil units and ducts, with individual zone control.
Efficiency
Heat recovery units on the ventilation with CO₂ sensors and centralized BMS control to optimize consumption.
Site photography — 2
Industrial
Clarios Iberia P&D
Guardamar del Segura, Spain
HVAC system for battery curing/tempering chambers. Rigorous temperature and humidity control to oxidize residual lead, remove moisture and generate lead sulfate crystals.
Technical solution
Production
Heating via hot-air generators to raise the temperature, using a heat exchanger.
Distribution
Forced air circulation and primary air supply; humidification by misting with demineralized water.
Efficiency
Redundant PLC/HMI control of temperature and humidity (40–100 °C / <15–90% RH) to ensure cycle consistency.
Site photography — 2
Industrial
Biomass Power Plant
Logrosán, Spain
HVAC installations across the turbine, electrical, administrative, laboratory, changing room and workshop buildings. Thermal comfort per RITE and mechanical ventilation, including in ATEX explosion-risk zones.
Technical solution
Production
Centralized installation using high-capacity aerothermal technology (VRF and air-to-water systems).
Distribution
Hydronic and direct expansion networks, via sealed sheet-metal ducting and fan coil units.
Efficiency
Enthalpy recovery units on the ventilation and EC fans, with integrated management via BMS.
Site photography — 2
Residential
Denia Beach
Denia, Spain
High-end apartment complex near the beach, with multiple home types. Maximum individualized comfort and the energy efficiency required by Spain’s Technical Building Code (CTE).
Technical solution
Production
Centralized production using air-to-air heat pumps (inverter split systems).
Distribution
Refrigerant gas network and insulated fiberglass panel ducting.
Efficiency
Individualized control per home and air renewal via shunt ducts, per CTE Basic Document HS-3.
Site photography — 2
Residential
Torrent Homes
Torrent, Valencia, Spain
Cutting-edge residential complex. The project focuses on maximizing energy efficiency and thermal wellbeing in rooms with large windows and functional layouts.
Technical solution
Production
Direct expansion multi-split and mono-split inverter units with high seasonal performance and an optimized compression cycle.
Distribution
Low-profile ducting in fiberglass and aluminum panel, minimizing pressure losses and guaranteeing thermal insulation.
Air quality
Mechanical renewal via extractor fans and a shunt duct network.
Site photography — 2
Residential
Residencial Azara
Playa de San Juan, Alicante, Spain
A firm environmental commitment: advanced high-efficiency systems, cutting-edge technologies and the strategic use of renewable energy to minimize environmental impact.
Technical solution
Production
Aerothermal air-to-water heat pumps with high COP/EER for climate control and DHW.
Distribution
Low-profile fan coil units via insulated ducting, and radiant heating-and-cooling floors.
Sustainability
Photovoltaic self-consumption and CMV with heat recovery, per Basic Document HS-3.
Site photography — 2
Residential
Residencial Evolution
Calpe, Spain
Residential complex with garage levels. High-performance thermal solutions to maximize hygrothermal comfort, in architecture of high efficiency and cutting-edge aesthetics.
Technical solution
Production
Multi-task aerothermal heat pump with simultaneous management of hydronic and direct expansion cycles.
Distribution
Underfloor heating over high-density panel, and low-profile ducting with adjustable static pressure.
Sustainability
Controlled mechanical ventilation using low-consumption extractor fans.
Site photography — 2
Residential
Celera Nauta Moreras
Moreras, Valencia, Spain
Residential complex with common areas. The technical design prioritizes compliance with high energy standards through integrated high-efficiency, low-CO₂-emission systems.
Technical solution
Production
Multi-task aerothermal heat pumps for DHW and direct expansion climate control.
Distribution
Low-profile ducting with adjustable static pressure and an insulated transport network.
Sustainability
Low-consumption CMV with rigid thermoplastic ducting, per Basic Document HS-3.
Site photography — 2
Residential
Residencial Orizonne
Villajoyosa, Spain
Residential development currently under construction. Optimal seasonal performance and maximum thermal comfort, with intelligent control systems in architecture of high efficiency and low consumption.
Technical solution
Production
Direct expansion with high-performance Power Inverter technology to optimize consumption at partial load.
Distribution
Low-profile ducting with adjustable static pressure and a thermally insulated diffusion network.
Sustainability
Low-consumption controlled mechanical ventilation (CMV).
Site photography — 2